Ram Warns Motorists of Construction Challenges

Oct 21, 2023 at 10:13 am by WGNS


(MURFREESBORO) Falling leaves, cooler days and cold nights. The season is changing and construction crews are working to make deadlines. Murfreesboro Transportation Department's Deputy Director Ram Balachancdran checked his computer and determined areas local motorists might wish to avoid between today and October 28, 2023.

City Construction Projects    

Beasie Rd Extension (River Rock Blvd just north of Racquet Club Dr)

Expected Lane Closures:   Monday Through Friday:  Riverrock Blvd will be reduced to one-lane flagging operation at Beasie Rd for waterline installation work.  Road and bridge construction work over Stones River Greenway continues.  The greenway trail will be closed around the existing Beasie Rd area until further notice due to bridge construction work over the greenway trail.  There will be no through trail access between the Old Fort Park and Cason Trailhead.  Appropriate traffic controls will be in place. 

 

Elam Rd Re-Alignment Project (Joe B Jackson Pkwy just east of I-24 Interchange)

Expected No Road Closures:   Monday through Friday:  Contractor for a private development will be doing new road construction work along Elam Rd and Joe B Jackson Pkwy.  There will be no street closures.  There will be minor traffic interruptions from construction vehicles entering and exiting along Elam Rd and Joe B Jackson Pkwy.  Appropriate traffic controls and will be in place.

 

Ramp Improvement, Lighting and Signalization Project (I-840 and Veterans Pkwy Interchange)

Expected Lane Closures:   Monday through Friday:  Contractor for TDOT will be making ramp improvements, installing streetlights and traffic signals at I-840 and Veterans Pkwy.  There will be traffic interruptions and intermittent lane closures from construction activities.  Appropriate traffic controls and will be in place.

 

Signalization Project (Veterans Pkwy at Westlawn Blvd)

Expected Lane Closures:   Monday through Friday:  Contractor for a private development will be installing a traffic signal at Veterans Pkwy and Westlawn Blvd.  There will be minor traffic interruptions and intermittent lane closures from construction activities.  Appropriate traffic controls and will be in place.

 

NW Broad St Turn Lane Improvements and Paving Work (between Overall Creek Bridge and Singer Rd )

Expected Lane Closures:  Monday through Friday, 8:30 am – 3:30 pm:  Contractor for a private development will be performing incidental pavement marking and cleanup work along NW Broad St between Overall Creek Bridge and Singer Rd.  There will be minor traffic interruptions on NW Broad St.  Appropriate traffic controls will be in place.

 

Water Line Installation Work (Westlawn Blvd near Veterans Pkwy)

Expected Lane Closures:  Monday through Friday:  Contractor for a private development will be installing water line across Westlawn Blvd near Veterans Pkwy.  There will be lane closures and traffic shifts on Westlawn Blvd.  Appropriate traffic controls and will be in place.

 

Right Turn Lane Installation Work (Greshampark Dr near Wilkinson Pike)

Expected Lane Closures:  Monday through Friday:  Contractor for a private development will be installing a right turn lane on Greshampark Dr near Wilkinson Pike.  There lane closures and traffic shifts on Greshampark Dr.  Appropriate traffic controls will be in place.

 

Water line Installation Work (Westlawn Blvd just west of Veterans Pkwy)

Expected Road Closures:  Monday through Friday:  Contractor for a private development will be installing water line across Westlawn Blvd just west of Veterans Pkwy.  Traffic to and from Veterans Pkwy will be detoured onto Shores Rd and Birchtree Dr. Appropriate traffic controls and will be in place.

Annual City Street Paving

Expected Lane Closures:  Monday through Friday, 9:00 AM – 3:00 PM:  City contractor will be performing construction work at the following streets:

  1. Middle Tennessee Blvd between MLK and S E Broad St (final striping work)
  2. Medical Center Pkwy EB between I-24 and Thompson Ln (roadway and traffic signal improvements)
  3. McKnight Park Rd extension off Lt. Patrick McBride Dr ( roadway construction work)
  4. Saratoga Dr, Balmoral Way and Clarence Ct ( paving work)
  5. Leaf Ave, Rose Ave, Clover Ave, Sloan Ave (Leaf Ave to Palmer Dr), Palmer Dr and Boston St (Palmer Dr to MTB) and Harrison Ave (casting work)

Expect lane shifts and traffic interruptions.  Appropriate traffic controls will be in place.

 

TDOT Resurfacing Projects

RUTHERFORD COUNTY I-840

The resurfacing of I-840 from the West Fork Stones River Bridge to near Exit 61

 

RUTHERFORD COUNTY SR 10

The resurfacing on S.R. 10 from the Bedford County line (L.M. 0.00) to S.R. 269 East. (L.M. 4.29)

 

RUTHERFORD COUNTY SR 96

The resurfacing on SR-96 from Carol Drive (L.M. 6.45) to near I-24 (L.M. 9.5)

The resurfacing on SR-96 from Compton Road (16.73) to Cainsville Pike (20.50)

 

RUTHERFORD COUNTY SR 99

The grading, drainage, construction of retaining walls, signals and paving on SR-99 (New Salem Hwy) from near I-24 to SR-96 (Old Fort Pkwy)

 

RUTHERFORD COUNTY SR 266

The grading, drainage, construction of two concrete bulb tee beam bridges, signals, and paving on SR-266 (Jefferson Pike) from SR-102 (LM 5.0) to E. of I-840 (LM 9).

(Source: TDOT)

Tags: 2023 areas to avoid Murfreesboro road work Ram Balachandran today through Oct. 28 transportation department WGNS
Sections: News